Quality assurance in traffic route construction
The content on this page was translated automatically.
| Module descriptions | |
|---|---|
| Module description | Building material testing & -optimization in traffic route construction |
| Submodule | Quality assurance in traffic route construction |
| Semester of study | 8th, summer semester |
| Responsible for the module | Dr.-Ing. Mollenhauer |
| Lecturer(s) | Dr.-Ing. Mollenhauer |
| Teaching form | 2 SWS unlimited number of participants |
| Credits | 3 credits |
| Prerequisites according to examination regulations | |
| Recommended prerequisites | Road construction technology, structural maintenance of traffic routes |
| Intended learning outcomes | The aim of the module is to teach the procedures for ensuring the permanent quality of traffic route pavements (focus on roads). |
| Content | Structure of the regulations Quality assurance through initial testing Production control and control tests Possibilities of recycling building materials in traffic route construction; Preparation of an initial test for asphalt mixes (laboratory practical course) |
| Course and examination achievements | This sub-module is examined together with the module "Optimization of construction materials in traffic route construction".
|
Literature | Lecture notes, FGSV regulations (TL Asphalt, TL Concrete, etc.) |
Quality assurance
Dr.-Ing. Konrad Mollenhauer
Module Construction Material Testing & -optimization in traffic route construction
2 SWS, 3 credits, summer term
Intended learning outcomes
The aim of the module is to teach the procedures for ensuring the durable quality of traffic route pavements (focus on roads).
Content
- Structure of the regulations
- Quality assurance through initial testing
- Production control and control tests
- Possibilities of construction material recycling in traffic route construction;
- Preparation of an initial test for asphalt mixes (laboratory practical course)
Course and examination achievements
- Preparation of an initial test report for an asphalt mixture (group work), (40 %)
- Total examination or oral examination (60 %)
Literature
- FGSV regulations (TL Asphalt, TL Concrete, etc.)