Completed projects
The content on this page was translated automatically.
- Representative determination of performance-relevant asphalt properties as a basis for new contract conditions (BMVBS)
- CoRePaSol:Characterization of advanced cold recycling bitumen stabilized pavement solutions(CEDR)
- EARN: Effects on Availability of Road Network (CEDR)
- Evaluation background cold properties(BMVI)
- NaHiTAs: Sustainable high-tech asphalt: Reducing pollutants and noise with new processing and monitoring(BMBF)
- Quality assurance of asphalt without solvents - development of alternative procedures for the implementation of the WPK(BMWI / AiF)
- CRABforOERE - Cold Recycled Asphalt Bases for Optimized Energy and Resource Efficiency (CEDR)
- AG-FTIR: Incoming inspection of reclaimed asphalt using FTIR spectroscopy for optimized reuse in the asphalt mixing plant (BMWi / AiF)
- KRC-Verifikation: Verification of the mix design of cold-bound bitumen-dominant base courses and derivation of dimensioning principles (BMVI)
- FoBiere: Foamed Bitumen technology as Energy and Resource Efficient alternative for recycling of asphalt (BMBF)
- Interlaboratory test 25/46: Resistance to permanent deformation and cold properties Determination of precision in interlaboratory tests (BMVI)
- BEZIBIT: Investigation into the characterization of bitumen (BMDV / subcontract TU Braunwscheig)
- AC BE: Investigations into the use of asphalt concrete with bitumen emulsion in asphalt base layers (BMDV)
- QTA: Development of a testing system for the quality assurance of temperature-reduced asphalts (BMDV, subcontract TU Braunschweig)
- InQuAs: Innovative quality assurance in asphalt production: Continuous production monitoring and improvement of occupational health and safety by significantly reducing exposure to solvent vapors (BMWK / Aif-iGF)
- Integrating the benefits of recycling approach and warm mix asphalt technology: New insights toward accelerating the diffusion phenomenon between new and aged bitumen (Georg-Foster Stipendium)